About Project:
This project was the construction and design of a purpose built steel framed gym area which was fabricated with Kingspan insulated sheeting. Concrete floors poured and brought to certain level and smooth finish to allow rubber matting be installed. Heavy duty security doors were fitted. All lighting and electrical safety equipment were fitted by our trusted electrical team.